More time to place parts
It gives operators about 45 to 60 seconds of open time for alignment after pre-activation.
FLASHBOND product
UV/LED cure dual-cure cationic epoxy
Lower-viscosity dual-cure UV epoxy for fixturing and assembly
UV-2910DC is a dual-cure light cure epoxy. UV pre-activation gives a 45 to 60 second open time for part placement; final cure follows at room temperature or accelerates with mild heat (30 minutes at 60°C). Low shrinkage and outgassing make it suited to bonding optics, fibers, lenses, prisms, connectors, and electronic components.
In plain English
UV-2910DC provides about one minute of post-exposure placement time for optics, connectors, and small electronic parts.
Product fit
It gives operators about 45 to 60 seconds of open time for alignment after pre-activation.
Low shrinkage and low outgassing help when movement, fogging, or contamination are a concern.
You can let it finish at room temperature or accelerate the cure with 30 minutes at 60°C.
Technical data
Typical values for reference only. Use these material, cured-state, and cure-window values to compare fit before confirming specifications.
| Chemical class | Cationic epoxy |
|---|---|
| Viscosity at 25°C | 2,500 to 5,000 cps |
| Specific gravity | 1.12 |
| Color | Translucent |
|---|---|
| Hardness | Shore D 75 |
| Glass transition (Tg) | 45°C |
| Linear shrinkage | 0.8% |
| Tensile strength | 3,000 PSI |
| Lap shear (Al/Al) | 2,500 PSI |
| Elongation at break | 7.6% |
| Water absorption (24 hr) | 0.15% |
| Service temperature | -55°C to 150°C |
| Dielectric strength | 420 V/mil |
| Volume resistivity | 1.0 x 10¹⁴ Ω-cm |
| Pre-activation | 100 to 150 mW/cm² at 365 or 405 nm, 6 to 8 s |
|---|---|
| Open time | 45 to 60 seconds |
| Full cure (after assembly) | 24 hours at 25°C, or 30 minutes at 60°C |
| Direct full cure option | 20 to 30 s, or 250 mW/cm² for 10 s |
Shelf life and storage
Optimal storage 10°C to 25°C in unopened container. Keep away from light. Storage outside 10°C to 28°C can affect properties.